No. The survey time frame is the period in which the projects must have been active. The work performed by a company on such projects could be before or after the survey time frame. However, the data submitted must reflect work already performed before the data submission cut-off date.
October 2018
Tags: Wage And Hour, Davis Bacon Wage Surveys
Log in or Register to save this content for later.