fbpx

How should wage data be reported for operating engineers on the WD-10 Form?

  • Home
  • /
  • How should wage data be reported for operating engineers on the WD-10 Form?

Data for operating engineers needs to be reported by piece of equipment used on the project, e.g., Backhoe Operator, Bulldozer Operator, Loader Operator, etc. You should report the number of workers operating each piece of equipment on the project and the wage rate paid to each worker.


October 2018

Tags: Wage And Hour, Davis Bacon Wage Surveys

Log in or Register to save this content for later.
>